Start of construction work!

The first step of the construction work has been taken! The construction of the floor panel for the STOA169 has started. The contractor Georg Kölbl from Wessobrunn took on the job and was directed to carry out the work as carefully as possible. The future statics of the hall require a stable foundation, therefore the floor must be removed and replaced to a depth of approx. 80cm. The concrete slab should be poured by Christmas, before resting in order to “adjust“ to the ground. The installation of the artist columns can only start then.